Bệnh viện Trung ương Huế (Hue Central Hospital), established in 1894, was the first Western-medicine hospital in Vietnam; it is now 1 of 3 special-class hospitals under the Ministry of Health, with 3,939 beds on a site of about 190,000 m² (including campus 2). It is the main teaching hospital of Hue University of Medicine and Pharmacy and the tertiary referral centre for about 25 million people in central Vietnam.

The Oncology Center opened on 16 January 2016 — a 7-storey building of about 10,000 m² with total investment of about VND 200 billion (including EUR 17 million of concessional ODA funding from Austria) — comprising departments of surgery, chemotherapy, radiotherapy and palliative care.

The Ministry of Health plans to build 1 of the 3 national proton therapy centres (2026-2030) at Hue Central Hospital, alongside Bệnh viện K and Bệnh viện Chợ Rẫy.

It performed the first autologous haematopoietic stem cell transplant for a patient with non-Hodgkin lymphoma in central Vietnam.

Scale

Hospital-wide: 3,939 beds (including campus 2); Oncology Center: a separate 7-storey building of about 10,000 m² Cancer cases treated per year: not publicly disclosed

Accreditation

No JCI accreditation (a special-class public hospital under the Ministry of Health). ISO 15189:2012 for 3 laboratory departments (Biochemistry, Haematology, Microbiology - granted in 2022); ODA funding in cooperation with Austria for the Oncology Center; planned as 1 of the 3 national proton therapy centres (2026-2030).

Strengths and key treatments

Elekta Axesse linear accelerator (a latest-generation unit at the time of opening), with a treatment time of about 10 minutes per session and radiosurgery capability.

Autologous haematopoietic stem cell transplantation supporting the treatment of breast cancer, ovarian cancer and non-Hodgkin lymphoma.

Early endoscopic intervention for early-stage gastrointestinal cancer lesions.

A planned phase 2 expansion with a PET-CT/cyclotron system (still at the planning stage, with no confirmed completion date).

Planned as 1 of the 3 national proton therapy centres for 2026-2030, alongside Bệnh viện K and Bệnh viện Chợ Rẫy.